CQI-11 PLATING SYSTEM ASSESSMENT PDF

Special Process: Plating System Assessment. Product Code: CQI Pricing This manual includes a downloadable assessment with forms to complete the. Recently our company was asked when we will implement the CQI Plating System Assessment Program. Before we can do anything we must find out what it . The goal of the assessment is the development of a plating management system that provides for continual improvement, emphasizing defect prevention and the.

Author: Malajind Gardalmaran
Country: Nepal
Language: English (Spanish)
Genre: Art
Published (Last): 12 September 2007
Pages: 383
PDF File Size: 8.82 Mb
ePub File Size: 4.21 Mb
ISBN: 648-2-57735-137-5
Downloads: 25139
Price: Free* [*Free Regsitration Required]
Uploader: Kizahn

Non-plated, in-process, and finished product shall be properly segregated and identified. A frame for suspending or holding articles during plating and related operations.

After emptying and before reusing containers, containers shall be inspected to ensure that cqi1-1 parts and inappropriate material have been removed. The job audit is not the only or main focus of the PSA. The reprocessing procedure shall describe product characteristics for which reprocessing is allowed as well as those characteristics for which reprocessing is not permissible.

The specific plating processing parameters applies to 5. Such parameters shall not only be defined, they shall have operating tolerances as defined by the organization in order to maintain process control. The existence of an AIAG publication does not in any respect preclude anyone platijg manufacturing, marketing, purchasing, or using products, processes, or procedures not conforming to the publication.

  ASCE 43-05 PDF

May 3 — 4, Date of Previous Assessment: All characteristics, as pltaing by the organization and its customers, shall be identified, defined, and addressed in the FMEA. List each requirement below and validate.

CQI | Plating System Assessments

Experience in the assessment of plating management systems would be beneficial. Date of Previous Assessment: Current amperes per unit area. The customer may have additional requirements, e. All reprocessing activity shall require a new processing control sheet issued by qualified technical personnel denoting the necessary plating modifications.

Work instructions specifically action and product segregation in the event of an addressing potential types of equipment emergencies and failures shall be accessible to and understood by equipment emergency equipment operators.

Identified actions shall be prioritized and shall include timing estimated completion dates. Each participant will receive a training manual. Enter the date s of the assessment.

This information determines the appropriate Process Table that shall be used during the assessment. A crossAre finish process control functional team, including a production operator, shall plans up to date and reflecting be used in the development of Control Plans, which current processing?

These process specifications may take the form of work instructions, job card, computer-based recipes, or other similar documents.

  JOHN DOWLAND LACHRIMAE PAVAN GUITAR PDF

CQI Plating Assessment_图文_百度文库

Elimination of a passive condition on a surface. Job Audit Process Requirement Tables.

Training Offerings by Industry. The organization shall document this process of review and implementation, and it shall address how customer and industry documents are obtained, how they are maintained within the organization, how the current status is established, and how the relevant information is cascaded to the shop floor within the two-week period.

CQI-11 Plating System Assessment

Packaging Requirements Are packaging requirements identified? Electrolytic cleaning in which the work is the anode. CQI Plating System Assessment is a self-assessment of the plating system regarding galvanic plating and must be carried out at least once a year. Publication of the documents requires approval by the Quality Steering Committee.

Plating System Assessments (CQI-11)

Current Quality Certification s: It shall identify both primary and secondary backup personnel for the key functions as defined by the organization. Testing and Calibration Labs. Shipping Requirements Were the parts properly identified? The positive electrode in electrolysis, to which the negative ions are attracted.